ENERGY by NATIVE AMERICAN DESIGN

Projects - Past Performance

Below are listed Just a small sample of past projects ENAD has been contracted to perform.

Electrical / Hydro

ENAD has been one of the primary BIA customers for multiple contracts servicing the Colorado River Agency, Electrical Services for several years. ENAD has repaired, constructed, and maintained the High Voltage Power Lines, Substations, Transformers, and Generating Facilities at Headgate Rock Dam. This includes Emergency repairs to the 3 turbines valued at approx $1.5 million and valve replacement project valued at $1 million,

Under ENADs nation-wide agreement with Atlas Polar, ENAD has installed and tested state-of-the-art waterway debris cleaning and control systems (refered to as Trash Rakes). Projects have included Cold Springs Power Plant, Boise ID, Armenta Plant in Bloomfeild, NM, and Tyhee Siphon Rehabilitation, ID, Port Washington, WI, and Salt Lake, UT

Electrical Procurement and Supply

Department of Energy contracted ENAD to supply Steel poles to WAPA valued at approx $5.1 million. ENAD procures and supplies Line Hardware to multiple WAPA locations for example Tupello Allen valued at approx $550K and Gering Nebraska valued at approx 100K.

UPS Inspection & Testing

ENAD has performed the annual inspection and testing for FCI properties in Oxford, WI, Tere Haute, ID as part of the BPA 5yr IDIQ

Construction & Electrical Contracting

ENAD was subcontracted to perform work for the Peach Springs Health Center, AZ valued at approx $1.8 million
ENAD was subcontracted for the CRIR Consolidated 28 Bridge project valued at approx $1 million

Electrical Power Distribution

Repair of Elec Distribution System, Grissom Air Reserve Base, IN

Crews designed the airfield lighting, installed new ducts under the runaway, repaired/replaced edge and overrun lights, constructed a 4,000-sf electrical building and access road, and installed/integrated new control components.

Electrical Upgrades and Renovations Afghanistan National Army Hospital (ANA) Kabul, Afghanistan

ENAD provided the planning, design, and construction of electrical upgrades at the ANA Hospital. The work included the assessment of an existing electrical study and the planning, design, and construction of electrical upgrades to five buildings from the Kabul North Substation.

Installation of Ductbank Runway 14/32, Dover Air Force Base, DE

Electrical work included demolition of the electrical systems in conjunction with the pavement demolition; removal of existing light fixtures and bases, handhole/manholes, and signs and bases; installation of ductbank, manholes and vaults, cable, and lights; runway and taxiway lights; and signs. In addition, all circuits in the vault were removed and replaced. (In all, 111 miles of electrical wire was installed.)

Communications, Fiber Optics & Data Lines

Design/Build Anti-Terrorism and Force Protection System Muscatatuck Urban Training Center (MUTC), IN

ENAD designed and constructed security upgrades at MUTC consisting of four new entry control points (ECPs), a security office, and a video surveillance system using 42 cameras and fiber optic cabling. A single-story, 1,000-sf security building was also constructed at the site with a monitoring area for surveillance video equipment.

Energy Management & Construction Services

Energy Conservation System Defense Dist Depot, Red River, TX

ENAD replaced the roof-top ventilation and lighting system at Building 499, the Defense Distribution Depot, with a high efficiency cooling and lighting system that conserves energy and promotes a more comfortable work environment.

Design-Build Repair Basewide EMCS Grand Forks AFB, ND

ENAD designed and constructed the upgrade and expansion of the existing Energy Management and Control System (EMCS) on Base to a Honeywell Enterprise Building Integration (EBI)/Energy Management System with new graphics.

Substation

North Substation Replacement, Dover Air Force Base, DE

Working at the North Substation, ENAD replaced the transformer, concrete transformer pad and circuit breaker. The new transformer is rated at 15MVA at 65 degrees with an overall minimum rating of 12/20/25MVA.

Substation and Electrical Power Upgrade for Level III Hospital, Camp Arifjan, Kuwait

As part of a multi-faceted project, ENAD constructed and installed a substation and 11kV loop installations to serve a local hospital.

Automated Meter Reading Systems (AMRS) Utility Mngt Control System (UMCS)

Upgraded and Installed Electrical Meters at Select Facilities Base-wide

New electric meters, current transformers, radio transceivers, radio repeaters, and servers were installed at various locations at seven separate Air Force installations. The new meters are compatible with the upgraded EMCS system at each Base and include energy management software to communicate and interface with other third-party energy management software platforms. ENAD provided a secure wireless infrastructure solution for each base and completed a radio path survey for each installation to receive wireless infrastructure. As a result of the project, each Base became compliant with EPACT 2005 and with the facility electric meter guide specifications.

Installation of Gas Meter with AMR Laughlin AFB, TX

At Laughlin AFB, ENAD performed the technical evaluation, design, procurement, and installation of 29 new gas meters in 22 buildings and the replacement of one existing turbo meter at the Base primary gas feed. Pulse kits were installed on each meter.As part of a multi-faceted project, ENAD constructed and installed a substation and 11kV loop installations to serve a local hospital.

Interior & Exterior Lighting

Child Development and Youth Activity Centers Fort Bliss and Fort Sam Houston, TX

ENAD designed and constructed three new child development centers at Fort Bliss and a youth activity center at Fort Sam Houston. Each Center serves between 60 and 90 school-age children. All of the Centers were designed and constructed as Sustainable Design and Development projects, and adhered to all SPiRiT-mandated construction practices, requirements and calculations. The Centers were also designed and constructed to attain a USGBC LEED rating of Silver, which promotes energy efficiency. In addition to energy-efficient lighting, the Centers also have communications conduit for future video monitoring security system/cctv cameras and energy management control systems with temperature and humidity sensors

Projects

MOST RECENT PROJECTS

BIA Headgate Rock Dam - Urgent turbine repair, Servomotor Overhaul, Scada and UPS battery backup

W912HP-18-R-5002 ST Stephan’s SCADA Hydro Upgrade

H7-7846 Atlas Polar Dt 8300 Rake Upgrade

Atlas Polar - Tyhee Siphon Rehab Rake

Atlas Polar - Tiger Creek Rake

Atlas Polar - Rubber Dam Trash Rake

FCI Wisconson Oxford FCI Annual Inspection, IR testing 5 yr. BPA

A17PS00457 ELECTRICAL LINE Hardware 5 yr. BPA

15B41819DUP140233 FCI Terre Haute 5 yr. BPA Annual Inspection

140A1619P0606 SIPI Back Up Generation

140R4019P0097 Elephant Butte Hydro plant Panel & Switchgear Replacement

140A2320P0164 BIE Back Up Generation Installation

140D7020PA001 Head Gate Rock Dam Replace Cooling Water Strainers

140A1120B0003 BIA Electrical Distribution Line Repair (15KV Restring)

140A1119C0010 Emergency Electrical Utility Power Pole (69KV Storm Repairs)

WAPA Dead Tank Circuit Breakers

WAPA - Tupelo Allen Hardware Restack

Let’s Build the Future of Energy Together

Partner with a contractor that understands the complexity and importance of modern energy infrastructure.